Packaged Rooftop Unit Crane Set

A packaged rooftop unit replacement set by crane onto new structural steel. The crew staged the lift from the lawn, rigged the unit on a spreader bar, and landed it on its rails in a single morning.

Rooftop EquipmentApril 20257 photos
01 / 48The boom fully extended with the unit rigged on a four-point sling. A spotter in high visibility works the roof edge, relaying hand signals to the operator on the ground.
02 / 48A crane swings the packaged rooftop unit onto the roof while the crew tracks its path from the deck. The unit lands on new structural steel rails set for this replacement.
03 / 48The unit hangs from the spreader bar moments before touchdown. Tag lines and the slings keep it level as it is guided down onto the rails.
04 / 48Two crew members in hard hats steady the unit as it settles into position. Final alignment happens by hand, inch by inch, before the rigging is released.
05 / 48Seen from the roof edge, the crane sits on the lawn below with the next section staged on the ground. The team confers on the sequence before the second pick.
06 / 48The Johnson Controls packaged unit set on its steel support frame, condenser fans facing up and slings still attached. Factory labels and electrical panels face the service side.
07 / 48A technician checks the unit's seat on the rails while the rigging is still under tension. Only after the frame is confirmed level and square does the crane let go.

Corridor Piping & Wall Penetrations

Overhead piping work in an occupied building corridor, with containment up and the hallway kept open. New runs pass through block walls, and each penetration is sleeved, packed, and closed with new block and mortar.

Piping & SteamOctober 20266 photos
08 / 48The crew works overhead from ladders in an occupied corridor. Plastic containment keeps dust off the adjacent rooms.
09 / 48A technician on the ladder works at the pipe rack above the door. The floor is protected and the corridor stays open.
10 / 48An insulated pipe elbow passing through a block wall, with new block and mortar being set to close the opening.
11 / 48A closer view of the elbow and the block infill. The sleeve is packed before the wall is closed.
12 / 48A pipe sleeve through the block wall with fresh mortar around the penetration. The jacket is taped where it meets the wall.
13 / 48A section of block wall with new mortar joints above a bare pipe run. The patch is left to cure before paint.

Steam Valve & PRV Replacement

Replacement of aging steam valves in a pipe trench: new flanged gate valves, a Y-strainer with blowdown, and a pressure reducing valve, all tied into the existing main with new black steel pipe.

Piping & SteamJune 20264 photos
14 / 48A new flanged gate valve with a blue handwheel installed on the steam line in the pipe trench, with a pressure gauge beside it. The old insulation was stripped back for the work.
15 / 48A new gate valve and flanged Y-strainer with a blowdown ball valve on the steam main. The strainer protects the regulator downstream.
16 / 48A spring-loaded pressure reducing valve with its pilot, set in the new black steel run. Downstream pressure for the building is set here.
17 / 48The completed run of new black steel pipe in the trench, with the PRV in the foreground and flanged connections back to the existing main.

Cooling Tower Piping & Valve Manifold

Supply and return piping for a BAC cooling tower, with a flanged butterfly valve manifold at grade and PVC risers over the top of the tower.

Cooling TowersApril 20263 photos
18 / 48The BAC cooling tower with its new PVC risers arching over the top, seen from behind the fence line. The access ladder and platform serve the fan deck.
19 / 48The supply and return manifold beside the cooling tower: PVC risers, flanged butterfly valves, and the lower connections set on a galvanized frame.
20 / 48A closer view of the valve manifold. Paired isolation valves on each riser let the tower be serviced without draining the loop.

Laboratory Exhaust Ductwork

Welded stainless steel exhaust ductwork for a laboratory building: risers through the penthouse floor grating, a labeled header, and stainless hooded vents on the roof.

Exhaust SystemsMay – June 20265 photos
21 / 48The header labeled LAB EXHAUST AIR with its direction arrow, with the fiberglass main and the stainless branches behind it.
22 / 48Welded stainless steel lab exhaust duct rising through the floor grating in the mechanical penthouse. The square risers tie into the main header above.
23 / 48Looking down the run of stainless risers and the header they feed. Each riser is supported on the grating with threaded rod from above.
24 / 48A stainless steel hooded vent on its curb on the gravel roof, with the lab building's louvered mechanical floor in the background.
25 / 48A second hooded stainless vent with a louvered screen, set on a curb with new flashing. The treeline and neighboring roofs are behind it.

Commercial Kitchen Exhaust System

A complete commercial kitchen exhaust system: stainless hood, welded grease duct, fire suppression, and the rooftop exhaust equipment set by crane.

Exhaust SystemsMay 20254 photos
26 / 48A new stainless steel Econ-Air exhaust hood hung in a commercial kitchen, still in its protective film. The welded black grease duct above connects it to the roof exhaust.
27 / 48The hood's fire suppression system installed in a wall recess beside it. The control cabinet and agent tanks are mounted and ready for final hookup.
28 / 48The upblast exhaust fan on the roof, set on a new curb with fresh flashing. The duct from the kitchen terminates here.
29 / 48A crane lifts the rooftop exhaust equipment from the parking lot on a rainy morning. The pick cleared the parapet and set down with the lot still open.

Base-Mounted Pump Replacement

Two base-mounted pumps replaced in a central plant, set on housekeeping pads with suction diffusers and the piping repainted and insulated.

Plant & Mechanical RoomsJuly 20262 photos
30 / 48Two new base-mounted pumps set on their pads with suction diffusers and freshly painted piping. Flexible connectors and gauges are in place.
31 / 48A wider view of the pump pair in the plant, with the insulated risers, gauges, and the yellow-striped floor marking the service aisle.

Central Plant Piping & Controls

Distribution piping and control valves in a central plant: insulated mains on pipe stands, with isolation, strainers, gauges, and actuated valves on each branch.

Plant & Mechanical RoomsSeptember 20262 photos
32 / 48The central plant's distribution piping: insulated mains, control valves with blue actuators, gauges, and labeled cold water lines overhead.
33 / 48A second angle through the plant. Pipe stands carry the mains, and each branch has isolation, strainer, and control valve in line.

Overhead Steam Line Replacement

A section of overhead steam piping replaced in black steel: welded flanges, new hangers, then insulation and PVC jacketing once the line was proven.

Piping & SteamJuly 20263 photos
34 / 48A new section of black steel pipe hung overhead with flanged connections at both ends, tying into the existing insulated lines.
35 / 48Close-up of the welded flange and clevis hanger on the new pipe. The weld is complete and the hanger carries the load from the beam above.
36 / 48The same line a few days later, insulated and jacketed in white PVC. The flanges are covered so they can be opened again for service.

Chilled Water Control Valve Replacement

An actuated control valve replaced on an overhead chilled water line, flanged into the existing insulated piping and wired back to the building controls.

Piping & SteamSeptember 20262 photos
37 / 48A new flanged control valve with an electric actuator installed overhead on the insulated line. Steam and chilled water mains run above it.
38 / 48The valve from the floor, with the chilled water return labeled beside it. The actuator wiring is being brought over to the controller.

Laboratory Ceiling & Air Distribution

Ceiling grid, lighting, and air devices put back in a teaching laboratory after mechanical work above the ceiling.

Ductwork & Sheet MetalJune 20262 photos
39 / 48A teaching lab with its ceiling grid and lighting back in place. The finished ceiling hides the mechanical work above it.
40 / 48The same lab from the bench side, with the grid and lighting complete above the workstations and the room ready to hand back.

Lab Support Fan Coil Closet

A fan coil unit and its copper piping in a small lab support closet, serving the corridor where the ultra-low freezers live.

Plant & Mechanical RoomsJune 20262 photos
41 / 48An ultra-low freezer sits in a lab corridor beside a small mechanical closet. Copper piping and the fan coil unit are visible through the doorway.
42 / 48Inside the closet: the fan coil unit with its copper supply and return, insulated flex duct above, and the drain run along the floor.

Above-Ceiling Duct & Pipe Rough-In

Spiral duct and copper line sets routed above a ceiling between existing plumbing and sprinkler lines, all hung and supported before close-in.

Ductwork & Sheet MetalJuly 20252 photos
43 / 48Spiral duct with an insulated elbow routed above the ceiling, threaded between labeled domestic hot and cold water lines and a sprinkler main.
44 / 48Copper line sets run along the block wall with insulated flex duct beside them. Everything is strapped and supported before the ceiling closes.

Mechanical Room Assessments

Walkthroughs of two mechanical spaces ahead of scoped work: an electrical and piping room, and a long utility corridor of air handlers.

Plant & Mechanical RoomsApril – June 20262 photos
45 / 48A basement mechanical room with electrical gear along one wall and insulated piping overhead. Ladders are staged for the overhead work.
46 / 48A long utility corridor lined with air handling units and overhead conduit. The walkthrough maps the equipment before the work is scoped.

Field Details

Two details from different jobs: a strut hanger assembly and a gasketed duct access door. Small work that the finished job depends on.

Ductwork & Sheet Metal2025 – 20262 photos
47 / 48A strut hanger assembled from a beam clamp, threaded rod, and slotted channel, holding flexible metal conduit below a spray-foam deck.